  8. |
  9. Hong Kong Waste Association Limited ISP-2223-27-001 (Project details)

Assessment

Vetting

Protection of the Project Data Confidentiality

Project Details

Enterprise Support Programme

Standard Project

Relocation Rental Support Project

Projects from New and Start-up Enterprises

One-off Rental Support Scheme

One-off Recycling Industry Anti-epidemic Scheme

Supporting Residential Buildings in Adopting Smart Bins Technology in Food Waste Collection and Recycling

One-off Frontline Recycling Staff Support Scheme

Application and Fund Disbursement Process

Project Details
Project Details
Reference No. ISP-2223-27-001
Applicants Hong Kong Waste Association Limited
Project Targets

The project mainly included the following areas:

  • An incentive scheme to produce at least 1,080 tonnes of plastic pellets in the project using EPS waste collected
  • Conduct a trial study: A project report that should include cost analysis of the feasibility of using proper technology to shrink the size of incoming EPS at source for potential of lowering the logistics cost. Estimated to have 3 – 6 machines on different waste generator sites for the 6-month trial
  •  A video would be produced to introduce the project to the public
Commencement Date 13-May-2022
Completion Date 12-Feb-2024
Project Duration (Months) 21
Approximate Approved Amount (HKD) $8,120,000
Type(s) of Recyclables Waste plastics
Target Quantity Processed(1)(2)(3)(tonnes) 1,200

Notes:
(1) Target quantity processed refers to the quantity of recyclables expected to be collected for the whole project.
(2) The figures are rounded to the nearest hundred.
(3) Some Industry Support Programmes aim to enhance the overall capability and productivity of the recycling industry, including providing training courses to enhance the skills of recycling practitioners, enhancing safety and health standards and certification/ registration schemes, developing guidelines and setting up economic incentive schemes, etc., and therefore no target quantity processed was set.